Uncommon insight. Unparalleled detail. One of a kind research.

Put our expertise to work for you

W|EPC: Renewable Methanol & Hydrogen – Analyzing Methanex’s (MEOH) Geismar Facilities

W|EPC: Renewable Methanol & Hydrogen – Analyzing Methanex’s (MEOH) Geismar Facilities. Lower-Cost Hydrogen Will Produce Cost Competitive Renewable Methanol: Pipe Dream or Reality? Global methanol demand sits near ~75 MTPA; with demand expected to ramp amid new EU and U.S. environmental mandates. Renewable Methanol (RM) is produced using Hydrogen (H2) from solar/wind and carbon dioxide (CO2) as compared to traditional methanol produced from fossil fuels (i.e. coal & natural gas). (Page 4)

September 2020
$950

W|EPC: Gorgon LNG – Assessing Potential Operational Contributors To Kettle Cracks, Mid-October A More Likely Restart

Gorgon LNG – Pump The Breaks On Crack Narrative: While potential fabrication errors have been the primary narrative around the Propane Kettle cracks that shut down Gorgon LNG, it’s feasible that operational issues (and one in particular) may have contributed or even partially caused the cracks on Train-2’s kettles, which could have significant and more complex implications.

August 2020
$950

W|EPC: Golden Pass LNG – Delay & Contingency Fund Estimates Continue To Ramp – Updated Project & Satellite Image Review

W|EPC: Golden Pass LNG (XOM, QP) – Delay & Contingency Fund Estimates Continue To Ramp – Updated Project & Satellite Image Review

August 2020
$1,900

W|EPC: LNG Canada Q320 Monitor – Labor Dynamics & Baseline Satellite Image Review

LNG Canada: Detailed Labor Review, Project Estimates, & Baseline Satellite Image Analysis (Shell, Petronas Kogas, Petrochina, Mitsubishi)

August 2020
$1,900

W|EPC: DOMINION ENERGY (D) – OFFSHORE WIND PROJECT MONITOR Q320

Dominion Energy (D) Q320 Capital Project Monitor: Key Takeaways

July 2020
$1,500

W|EPC Project Database

Our W|EPC Project Database includes relevant EPC, regulatory, and commercial data for across dozens of large-scale capital projects, along with our timeline and cost estimates, relevant diagrams, charts, supporting documentation, and detail that ultimately drive our one-of-of-kind project breakdowns and quarterly monitors.

July 2020
Subscription only

W|EPC: LNG Canada Update – Troubles Ahead For Shell’s LNG Flagship?

W|EPC: LNG Canada Update – Troubles Ahead For Shell’s LNG Flagship?

June 2020
$1,400

Energy Transfer (ET) Capital Project Monitor – Q220

NGL Frac’s 7/8 BPD cost is ~36% lower than NGL Frac #1’s ($2,233 vs. $3,500) even though construction wages increased ~18% ($56.1K vs.
$66.2K). Note: an optimized engineering design, lessons learned, shorter schedule, and/ or sharing of common utilities and offsite facilities are
possible explanations for this improvement.

June 2020
$2,600

Southern Company (SO): Vogtle Nuclear Project Q220 Quarterly Monitor

Regulatory Background: Vogtle is regulated by the Georgia Public Service Commission (GPSC). GPSC’s primary role is to protect rate payers & determine if project costs can be justifiably passed-through via utility rates.

June 2020
$1,900